Construction site on the A5 near Müllheim successfully finished!
Construction site on the A5 near Müllheim successfully finished!
Müllheim, Deutschland - Yesterday was a memorable day for everyone who moves on the A5 between Müllheim and Neuchâtel. The construction site at the Neuenburg motorway triangle towards A36 Mulhouse/Lyon is finally history. With the completion of the work, the speed limit of 60 km/h is now history during the day and 80 km/h in the evening. This regulation had ensured long backlogs in the past, especially at the Müllheim/Neuchâtel exit, such as the Stau a5 and the current traffic reports on
Rhine side channel and road user
Another aspect that affects traffic between Germany and France is the bridge over the Rhine side channel, which was repaired by the "Collectivité Europen d’Alsace". The repair work led to a two -month blocking of the northern bridge and are an important measure for the future of transport connections. According to French authorities, around 19,000 vehicles pass this bridge every day - a sign of the high importance of this transport connection.
Overall, the A5 remains a central element for the regional transport infrastructure and, despite the challenges of construction sites and high traffic, has proven itself as a reliable traffic axis. Now the drivers can look forward to more relaxed trips and use the A5 again without major restrictions.
Details | |
---|---|
Ort | Müllheim, Deutschland |
Quellen |