Traffic chaos threatens: Bridge over A81 only one lane from Monday!

Ab dem 5. Juli 2025 wird die Brücke über die A81 bei Böblingen auf einen Fahrstreifen reduziert, um den Abriss vorzubereiten. Autofahrer müssen mit Stau rechnen.
From July 5, 2025, the bridge via the A81 near Böblingen will be reduced to a lane to prepare the demolition. Drivers have to expect traffic jams. (Symbolbild/MBW)

Traffic chaos threatens: Bridge over A81 only one lane from Monday!

From next Monday, the traffic situation between Böblingen and Sindelfingen will be put to the test. The bridge over the A 81 on the airfield is reduced towards Böblingen on a lane. This measure is necessary to prepare the demolition of the bridge, which will bring longer waiting times for all drivers who want to go from Sindelfingen to Böblingen in the next few weeks. Rudolf-Diesel-Straße in particular is limited to a lane for several weeks, which also complicates the situation. [Kreiszeitung Böblingen] (https://www.krzbb.de/inhalt.bwei-boeblingen-und-sindelfingen-verkehr-werd-verengt. are.

But what exactly happens? On November 30th and December 1st, the so -called "elephant bridge" is torn down over the A 81, which leads a part over the railway tracks and a section over the highway. The part lying above the highway is removed and replaced by an 850 meter long lid, which is realized by the Deges. This measure is intended to reduce street noise in the neighboring districts, and the completion of the lid is planned by summer 2024. This shows that the city relies on sustainable solutions to improve the quality of life [Werner Sindelfingen] (https://werner-sindelfingen.info/autobahn closing-a81-brueckenabriss-sindelfingen-11-2024/).

diversions and traffic management

The traffic redirection will also be of great importance. During the demolition work, the A 81 is closed in both directions from Friday, November 29, 10 p.m. to Monday, December 2, 5 a.m. The detour of the motorway traffic takes place via Mahdentalstrasse, Neckarstraße, Hanns-Martin-Schleyer-Straße, Calwer Straße as well as the B 464. These diversions and the stressed traffic situation can be a significant challenge during the Christmas season, and in view of the visitor currents in the shopping centers.

traffic management, a sub -area of ​​road relativism, will play a central role here. The aim is to improve traffic processes as part of the existing infrastructure. Among other things, this includes the use of sensor systems that observe the traffic situation, as well as reporting networks for construction sites and other events. This modern digital technology is crucial to better steer traffic flows and increase traffic safety Wikipedia.

Although the upcoming work will take care of some detours and inconvenience, the long -term improvement of the traffic infrastructure in the region is undoubtedly a big goal. Everyone involved hopes for a successful and smooth implementation of the measures.

Details
OrtBöblingen, Deutschland
Quellen