Full closure of the L1125: Refurbishment between Sachsenheim and Bietigheim!

Ab 22. Juni 2025 wird die L1125 zwischen Großsachsenheim und Bietigheim-Bissingen wegen Sanierungsarbeiten vollgesperrt.
From June 22, 2025, the L1125 between Großsachsenheim and Bietigheim-Bissingen will be locked due to renovation work. (Symbolbild/MBW)

Full closure of the L1125: Refurbishment between Sachsenheim and Bietigheim!

In Baden-Württemberg, important road construction work is imminent: From June 22, 2025, the state road L1125 between Großsachsenheim and Bietigheim-Bissingen will be completely closed. The reason for this measure is extensive renovation work, which is expected to be completed by October 2025. As the Stuttgarter News The construction start on June 23, with a bomb probe at the confluence with the industrial road.

The full closure of the L1125 is necessary for safety reasons, since a half -sided construction is not possible. The first construction phase concerns the section between Kayhstraße (K 1636) and the confluence with Industriestrasse. In this phase, the Holderbüschle industrial area and the jet petrol station from Sachsenheim remain accessible. However, there will be a one-way regulation: the entrance and departure will take place via Max-Eyth-Straße and Ludwigsburger Straße.

diversions and construction process

Heavy traffic is diverted over Vaihingen/Enz and the B10. During the second construction phase, which will take place for about two weeks during the summer vacation, a further full closure between Industriestrasse and Ludwigsburger Straße is then required. These measures are part of a comprehensive renovation that includes the renewal of all asphalt layers, the security work on embankments, as well as the renovation and new construction of drainage systems. Finally, a crossing aid for cycling is also being built on the Mühlsteige.

The state of Baden-Württemberg is investing around 2.2 million euros in these measures. The Stuttgart regional council underlines the importance of preserving the infrastructural foundations for the region, especially according to the challenges of the past year, in which over 500 kilometers of road were renovated, 289 kilometers on state roads. As the press release from the Ministry of Transport a total of 433 million euros flowed into the renovation and Maintenance of streets, bridges and tunnels.

information for the residents

The upcoming renovation work is not only necessary, but also a sign of the constant efforts of the country to secure the infrastructure for the future. The reports make it clear that the Minister of Transport in Baden-Württemberg have a good hand when it comes to maintaining the transport network. Even if there will be short -term restrictions, the measure will have a positive effect on the safety and quality of the streets in the long term.

Details
OrtLudwigsburg, Deutschland
Quellen