Construction site chaos in Ludwigsburg: Drivers have to know that!

Construction site chaos in Ludwigsburg: Drivers have to know that!
Ludwigsburg, Deutschland - The drivers in Ludwigsburg should urgently adapt to changes in road traffic. From June 15, 2025, a new traffic report will come into force, which quits numerous construction sites and closures. These measures affect not only the motor vehicles, but also pedestrians and cyclists. The city administration has already taken measures to control the traffic in the best possible way and to alleviate the effects of construction work, such as ludwigsburg24.com.
In the following we give you an overview of the most important construction sites in the city:
construction sites and closures
- Abelstraße : full closure for car traffic until the end of December. The reason is district heating work in several construction phases.
- Alter Oßweiler Weg : full closure for car, pedestrian and cyclists until October, during the development of the Fuchshof.
- Beihinger Straße : half -side closure until June 21st for renovation work at the bus stop.
- Birklenstraße : full closure until July 2 due to a sewer and house connection.
- Fuchshofstraße : The foot and bike path is closed until October, further diversions are specified.
- hackstrasse : full closure until June 27 for renewal work of gas and water pipes.
- Hohenzollernstraße : Restricted accessibility by the end of June due to private demolition work.
- Lochwaldgraben (Oßweil) : The path remains closed until autumn due to exhaustive trees, without signposted diversion.
- Netzestrasse : full closure by the end of October between Moldaustraße and Eichendorffstraße for redesign work.
- Tübinger Straße : full closure until July 25th in the area of house numbers 22 to 24 during the renovation.
- Peter-Eichert-Straße : full closure from April 22nd to June 27th for the production of district heating management.
- Welser Straße : partially full closure until mid-December for deep and road construction work.
additional information and coordination
The city offers a comprehensive construction site overview that describes the location, duration and the type of work in detail. This can be viewed via the platform of the city ludwigsburg.de. Citizens can also find information on traffic management and diversions here. A construction site diary records progress in larger projects and thus supports the transparency of the measures.
Many construction sites are particularly active in the summer months, since traffic is lower during this time and water pipe breaks often occur. Those who are traveling by car should also be aware that there can always be delays due to technical renovations and emergency measures. It is recommended to find out about current traffic conditions before driving.
The city administration has also announced that conversions on the traffic light circuits are intended in order to optimize the flow of traffic on detour routes. Furthermore, residents are informed about throwing shipments about upcoming work in order to point out possible restrictions at an early stage.
If questions about the construction work, citizens can contact the city administration directly to the city administration at strassenverkehr@ludwigsburg.de . This promotes access to information on traffic changes in the best possible way and citizens have the opportunity to actively contribute to the dialogue.
Details | |
---|---|
Ort | Ludwigsburg, Deutschland |
Quellen |