Friedhofsweg in Hauingen: Refurbishment begins in 2026 - your money flows!

Friedhofsweg in Hauingen: Refurbishment begins in 2026 - your money flows!
Hauingen, Deutschland - in Hauingen, a district of Lörrach, is facing basic changes. The city administration plans to have a comprehensive renewal of the highly renovated Friedhofweg . This street is known for its numerous potholes, the lack of lighting and insufficient drainage options. The Hauingen local council has been demanding expansion for years and now something seems to be done.
The planned measures concern the section between Steinenstraße and Rechbergstrasse as well as the stabbing path to the bridge over the Soorattbach. A central point of redesign is the improvement of the parking situation: ten parking spaces, including two barrier -free, are to be created in front of the main entrance to the cemetery. A new sidewalk will also be set up from Rechbergstrasse to the main entrance of the cemetery. In addition, the installation of new street lighting and a thorough drainage system are planned.
comprehensive plans for the infrastructure
In order to carry out the planned work, comprehensive management work is necessary. The relocation of mixed and rainwater channels as well as the renewal of drinking water, gas and fountain lines are planned. In addition, fiber optic is also laid, which enhances the modern infrastructure of the community.
The plans will be presented on July 8th in the local council and an information event for the adjoining people took place on July 2. The decision on the Environment and Technology Committee is scheduled for July 10th. If the designs are approved, the execution planning and the award procedures should follow in the second half of 2025, so that the construction work can begin in spring 2026. The completion of the measures will be targeted for the end of 2026.
costs and contributions
What does the fun cost? The total costs for the road construction work amount to around 725,000 euros, of which 120,000 euros are paid at planning and additional costs. An additional 46,000 euros will be estimated for the new parking spaces. Some of these costs must be passed on to the residents. According to the Local Tax Act Baden-Württemberg , the development contributions for the residents are mandatory and are 95 percent of the contributable development costs.
The contribution ability of the Friedhofweg was put through its paces both internally and externally and this is considered to be subject to contributions. The development contributions are settled after the cost of the cost in 2027, with a survey in 2028. Semory also affects other streets such as Inzlinger Straße and Carl-Maria-von-Weber-Straße, which are also faced with first final production.
A B-plan replacement procedure will be necessary because there is currently no development plan. Therefore, the municipality is responsible for making necessary decisions about the implementation of the measures and the requirements for the development systems, as in defined.
A step in the right direction for the village community Hauingen! The expansion not only improves road conditions, but also the quality of life in the area is significantly increased.
Details | |
---|---|
Ort | Hauingen, Deutschland |
Quellen |