Full closure of the B27: Traffic in Bietigheim-Bissingen paralyzed!

Verkehrsbehinderungen in Bietigheim-Bissingen bis 30.06.2025 aufgrund von Sanierungsarbeiten an der B27. Autofahrer aufgepasst!
Traffic disruptions in Bietigheim-Bissingen until June 30, 2025 due to renovation work on the B27. Attention drivers! (Symbolbild/MBW)

Full closure of the B27: Traffic in Bietigheim-Bissingen paralyzed!

Bietigheim-Bissingen, Deutschland - drivers in Bietigheim-Bissingen will have to prepare for some traffic disruptions in the coming weeks. Since June 15, 2025, the renovation work on the B27, which will run by June 30, 2025, has been running. Several streets are particularly affected, and the road users are called up to pay special attention in road traffic. The renewal on the ceiling concerns a distance of about 2.2 km with reductions in the lanes and a passage width of 3.25 m [news.de] (https://www.news.de/auto/858567937/verkehrsordnung-zur-vollsport-bietigheim-bissingen-stuttgart-baden-wuertember G-Stoverung-Wegen renewal-an-ceiling-from-15-06-2025-06-2025-on-B27-Stuttgarter-Strasse-Freiberger-Strasse/1 /).

A central concern of the construction work is to ensure access to the buildings on Freiberger Straße. Departments for cars and trucks are set up via Carl-Benz-Straße and Bahnhofstrasse, which extends the bypass route by about 2 km .

Details on the construction sites

The work focuses on several locations, and here the most important points:

  • Stuttgarter Straße/B27, OT Book: June 15 to June 30, 2025, 1:00 p.m. - 9:45 p.m.
  • Poststräßle/B27, OT Bietigheim: June 15 to June 30, 2025, 1:00 p.m. - 9:45 p.m.
  • Freiberger Straße/B27, OT Bietigheim: June 15 to June 30, 2025, 1:00 p.m. - 9:45 p.m.

These construction sites are part of the comprehensive renovation program that has existed since May 2025. During the renovation work, heavy traffic restrictions and longer -lasting traffic jams can be expected. From the l1125 in particular, from the 22. June 2025 full closures between Großsachsenheim and Bietigheim-Bissingen are added, which will further tighten the situation. Various restrictions have already been made in the past few weeks, including a one-way street regulation in Poststräßle and Freiberger Straße from June 1st, which redirects the traffic flow [bietigheim-bissingen.de] (https://www.bietigheim-bissingen.de/rathaus-politik/aktuelles/sanierung-b--und-und-und--und--und.

traffic flow and diversions

The new construction site plan also stipulates that from Industriestraße through Asperger Straße will be redirected back to the B27. Comes from the A81 motorway also have to prepare for changed routes. The Avia petrol station is still accessible via Asperger Straße, but the accessibility for some of the buildings on the B27 is limited.

There is a positive sign for commuters: the traffic volume has so far been limited, with the exception of push -time times in rush hour traffic. Nevertheless, drivers should be patient if they want to use the affected routes. Preferred diversions are available and already signposted-that makes the information channels even clearer for the citizens [suedkurier.de] (https://www.suedkurier.de/region/schwarzwald-baar-kreis/die-sanierung-des-bahnuvergangs-breben ;art372502,1968531).

Details
OrtBietigheim-Bissingen, Deutschland
Quellen